Air Operations Facility, NAS, Norfolk, VA
MACTEC performed a value engineering study for this 2-story Operations Building (22,400SF) complete with control tower and airfield lighting vault. The VE effort resulted in implemented savings of $2.3 million for this $8.2 million project.
|
|

Air Passenger Terminal, Naples,
Italy
MACTEC performed a value engineering study for this 42,500 SF air passenger terminal. The
terminal proceeses over 65,000 Military passengers per year. The VE effort resulted
in implemented savings of $328,000 for this $7.2 million Atlantic Division, Naval
Facilities Engineering Command, project.
Air Cargo Terminal, Naples, Italy
MACTEC performed a value engineering study for this
63,000 SF cargo storage terminal. The VE effort resulted in implemented savings of
$227,000 for this $6.7 million Atlantic Division, Naval Facilities Engineering Command,
project.
|
|
|
|
|

Military Logistics Terminal, NAS, Norfolk, VA
MACTEC performed a value engineering study for this 40,000 SF international terminal that processes 10,500 military passengers per year. The VE effort resulted in implemented savings of $2.1 million for this $12.7 million project.
|
|