Education


CISAT ACADEMIC BUILDING, PHASE III
JAMES MADISON UNIVERSITY

MACTEC conducted a four-day value engineering study of the new 87,900SF building to house physics and chemistry instructional laboratories, classrooms, faculty offices and academic support facilities.  The VE study resulted in savings of $2,138, 000 for this $20 million HLM Design project.

wpe80.jpg (12287 bytes)

Renovation of the N.B. Clements Middle School
Prince George, VA

MACTEC performed a value engineering study for the renovation of this 1950’s era building and build a two-story addition for 8 science rooms. When completed, the school will provide space for 1,200 eighth and ninth grade students.  The construction cost for this project is estimated at $10.8 million.  The VE team proposed $1.1 million in construction cost savings.

Scan423.gif (16863 bytes)

CISAT Phase II Academic Building
James Madison University

MACTEC performed a value engineering study on the new 214,000 SF classroom, administrative and atrium space in this state-of-the-art educational facility.  The construction cost for this project was estimated at $25 million.  The VE team’s effort resulted in estimated savings of $2.3 million.

Scan442.gif (24085 bytes)

Lord Fairfax Community College
Fauqier Campus, Warrenton, Virginia

MACTEC conducted a VE study of a proposed new two story building and the renovation of an existing barn to provide classrooms and laboratories for 800 students in this community college.  The VE study resulted in savings of $950,000 for this $8.3 million Virginia Community College System project.


Fredericksburg Area Campus, Phase II
Germanna Comunity College

MACTEC conducted a four-day value engineering study of the new two-story building that includes space for faculty offices, classrooms, distance learning classrooms, high technology classrooms, student study space and a work force development to benefit local business.  The VE study resulted in savings of $502, 000 for this $5.8 million Virginia Community College System project.

wpe7F.jpg (13090 bytes)

Renovation of Combs Hall
Mary Washington College, Fredericksburg, VA

MACTEC performed a value engineering study for the renovation of this 1958 science building to meet new education requirements the Historic Preservation & Instructional Technologies Department, Modern Foreign Language Department & English, Lingquistics and Speech Departments .  The construction cost for this project was estimated at $5,106,000.  The VE team proposed $612,000 in construction cost savings.

 

#454.gif (12723 bytes)

Military Reserve Training Center
Johnstown, PA

MACTEC performed a value engineering study on this new vehicle maintenance training facility for the Army Reserve. The 27,100 SF facility will incorporate classrooms, laboratory and a state-of-the-art vehicle maintenance facility.  The construction cost for this Northern Division, Naval Facilities Engineering Command project was estimated at $5.8 million.The VE effort resulted in savings of $474,000.